16 KiB
type, name, description
| type | name | description |
|---|---|---|
| types/instruction.md | issue-tracking | Where open work on this stack is tracked, what the four mandatory area/kind/prio/size labels and the two status flags on a Gitea issue mean, and how to keep an issue body current across sessions. |
Track open work as Gitea issues, not as prose in the repo
Open work on this stack lives at
https://gitea.nehmer.net/torben/chemenu/issues, one issue per work
package, and nowhere else. There is no TODO.md; there was, and every item in
it either became an issue or was already one, described twice.
That is the whole reason for this file: a second list is a second thing to maintain, and the one that drifts is always the one nobody reads first. The issue tracker wins that comparison outright - it has state, comments, labels, and a link that survives the change it describes. A markdown file in the repo has none of it, and it costs a publish to touch.
This instruction exists only in the dev repo. A distributed instance has no
issues at that URL, which is exactly why dist export excludes
instructions/dev/ wholesale (see tools/CONTRACT.md).
When to run
- Something is worth doing but not now. Open an issue; do not write it down in the repo.
- A session's findings outgrow the change it was making - a gap in the tooling, an assumption nobody has checked, a decision that needs the user.
- Picking an issue up: before doing anything else, read the body as the current spec, and re-label it if the ground has moved since.
- While working on one: the body is updated as the state moves, not at the end (step 2). A session that is interrupted leaves the body as its handover.
- Prioritising: deciding what to pick up next, or re-labelling after the ground moved.
- Closing one: the body is rewritten to its final state first, and only then closed (step 7).
- A rename or move ships: sweep the open issues for text that assumed the old name or path (§ Renames and other decay in the tracker).
Steps
-
Write the issue so it survives without you. What is broken or missing, why it matters, what "done" looks like as acceptance criteria, and the specific files or commands involved. An issue that only makes sense to whoever wrote it is a note, and notes were the problem.
Destructive steps carry the invariant they must not violate. A body that prescribes a mechanism gets built as prescribed - including its bugs. Where a step deletes, overwrites, resets or moves, name the property that must still hold afterwards, not only the command that gets there. "Remove the working directory, then
git checkout HEAD -- <stage>" is a mechanism; "the content stages must afterwards matchHEADexactly, without any untracked or ignored file being touched" is the same instruction plus its test - a build instruction and an acceptance criterion at once, so the defect surfaces while the test is written rather than in review afterwards. #30'supstream mergebody wrote the mechanism and got exactly that bug: a working-directory removal that took a stage's gitignored, unrecoverable data with it.An acceptance criterion states a checkable property, not an activity. "Implement X" is done when someone says so; "after
upstream merge,reports/still holds every file it held before" is done when it is true. This is not a ban on imperative steps - a numbered procedure can still produce a correct control flow, and that is its merit - it binds the destructive steps, and every box in the criteria list. -
The body is the working state, not a historical first post - keep it current as you go. It is this stack's plan file: the same thing a harness's own plan document is, and it is maintained the same way. Not written once, not brought up to date at the end, but updated whenever something in it stops being true - a decision made, a criterion met, an approach ruled out, a new constraint found.
The test is an abort, not a milestone. A session can end at any moment - an interrupt, a context limit, a crash, a human walking away - and whatever the body says at that instant is the entire handover. So the standard is: at every point, a fresh session must be able to open the body and pick the work up from there, without a human re-explaining it and without reading back through the comments. If the body would mislead someone who read it right now, it is already out of date, whether or not the work is finished.
That means updating during the work, not only at its end:
- a decision gets made → the decision and its reasoning replace the question
- an acceptance criterion is done → tick it, in the same session that did it
- something turns out differently than the issue assumed → the assumption is corrected where it stands, not contradicted three paragraphs later
- work is deferred or dropped → say so, with the reason, where the criterion is
Rewrite, never append. Do not add to a text that has become wrong: an additively grown log forces every later reader to reconstruct the current state by filtering the whole history, which is the exact cost the body exists to remove. Comments carry the history (step 3); the body carries the state.
Body rewrites and comments are an LLM session's job. A human normally touches only labels and metadata directly.
Reading an issue, the body is the state and comments are history. A session picking an issue up reads the body as the spec; comments are read for provenance - why something was decided, what was tried - never as the current instruction. A recommendation in a comment can be older than the body's decision and read just as convincingly: on #30 an earlier comment recommended a smaller,
verify-only command, while the body had since settled on building the fullmergecommand. A session trusting the comment would have built the wrong thing, with a plausible justification out of this repo's own tracker.A body that is demonstrably wrong is corrected first, not worked around. "Body beats comment" is a rule of precedence, not a licence to execute a stale spec. Where a comment or the tree proves a claim in the body false, the body is rewritten before the work starts - the rewrite above is the fix; leaning on the comments as the "real" state is not. #10 is the case: its body claimed coverage had never been measured while three comments carried a percentage, a statement count and a CI run number.
Where two comments contradict each other, evidence decides, not recency. On #10, one comment showed a retrieved artifact with zero items on a finished run - the report was not actually retrievable - and a later comment declared the same criterion met without re-checking. The later comment is not the newer truth, only the unchecked one. Resolve it into the body with the evidence named, or mark the point open.
-
Comment a changelog, never a copy. A body rewrite gets one short comment naming only what changed against the previous state - what is new, what is gone, what was corrected. Do not snapshot the old body into a comment: a full copy per revision forces a human to diff two prose texts, which is not a readable history, only another copy.
One comment per session's worth of change, not per edit. Step 2 asks the body to be kept current continuously, and a comment for every tick would bury the board in noise; the changelog line summarises what that session moved. Trivial upkeep - a typo, a tightened sentence - needs no comment at all.
**Changelog:** Decision 2 tightened - `kind/` may now change over an issue's life. Old acceptance criterion 3 dropped (covered by #42). -
Give it all four mandatory labels: one
area/, onekind/, oneprio/, onesize/. All four, always. Machine maintenance by an LLM session is what makes four axes affordable - the original objection to a third and fourth axis was the upkeep cost for a single human maintainer, and that objection no longer holds.area/Means area/kbThe kb/schema, contract, confidence machinery, lint - the knowledge base as a system.area/distributionShipping, upgrading and versioning an instance. area/corpusThe content and scope of kb/in this instance, and the demo/testbed question.area/workflowGit, merging, branching, publish, PRs. area/processThe development process itself, rather than the stack as an artefact. There is deliberately no
area/tools: tooling is filed under the domain it serves, not under where its code sits. The axis follows the stage split in AGENTS.md.kind/Means kind/decisionWaiting on an operator decision. kind/buildSpecified; waiting only on implementation time. kind/defectA finding: documentation and reality, or two documents, contradict each other. kind/is expected to change over an issue's life -decisionbecomesbuildonce the decision is made. That is session memory working, not a labelling failure.prio/Means prio/blockingBlocks or damages work in progress. Next. prio/plannedAccrues interest. Planned. prio/waitingWorth doing, waiting on a trigger. prio/waitingis not a graveyard. It means the issue's value is real but gated on something outside it - a decision, another issue, a second instance existing. Name that trigger in the issue, or the label is a polite no.size/Means size/SOne session, one publish, a clear cut. size/MSeveral files; a contract or instruction change; its own test effort. size/LSeveral sessions, or open design questions before the first commit. Size is effort, not importance. A
prio/blocking size/Sis the best thing on the board; aprio/waiting size/Lis a thing to talk about before anyone starts. -
Add a
status/flag only when it applies. Both are optional, because each describes a temporary condition rather than a property every issue has.status/Means status/blockedWaiting on another, still-open issue - not workable on its own, whatever its prio/says. Name the blocking issue in the body.status/unconfirmedA reported suspicion, not yet checked against actual behaviour. Applies to any kind/, not justkind/defect.While
status/unconfirmedis set,size/andprio/are provisional. Triage ends it one of two ways: the flag comes off andsize/prioare set for real, or the issue is closed with the reason. An unverified suspicion does not stay open indefinitely - the process-level analogue of AGENTS.md invariant 3. -
Re-label when the ground moves, and say why in a comment. A trigger that fired turns
prio/waitingintoprio/planned. A design question that got answered can drop a size and movekind/decisiontokind/build. Silent re-labelling is how a board stops meaning anything. -
Closing is the last body update, not a comment. If step 2 was followed the body is already nearly there, and closing only settles what the final run established. If it was not, closing is where the whole debt comes due - and it comes due at the worst moment, because a closed body is the version everyone reads afterwards and nobody revisits.
Either way the body reaches its final state before the issue closes: proposals that were decided read as decided, a "to decide" section has become the decision with its reasoning, acceptance criteria are ticked or struck with a reason, and what was verified is named. Then close, with the one-line changelog comment step 3 asks for.
Record what actually happened, not a commit hash alone: which proposals were implemented, which were deliberately left out and why, and what was verified. The issue is the only place that record survives - a changelog entry says what changed, not what was decided against.
A closing report in a comment does not satisfy this. It reads as complete to whoever writes it and leaves a body still phrased as open work: unticked boxes, an undecided decision section, present tense about a defect that no longer exists. #44 closed exactly that way, with a thorough comment above a body that still asked for a decision that had already been made and shipped. Nothing mechanical catches it (see below), which is why it is a step rather than a habit.
Renames and other decay in the tracker
A rename is not finished when the tree is green. Renaming a package, a path,
a command, a flag or the repository itself moves text that lives outside the
working tree, and the open issues are the largest such text. Nothing catches
them - wikitool does not know this tracker exists and must not learn (see
"What no tool checks" below) - so a pass over the open issues is part of the
rename, in the session that did it, not a follow-up someone remembers.
Distinguish a wayfinder from a piece of evidence: a path meant to point at where something is gets pulled through; a path quoted for what was true at a time is left standing and dated. Note per corrected body what was pulled through and when, so the next pass can tell a checked body from one that merely looks right. Closed issues are out of scope - they guide nobody.
Renames are not the only thing that ages an issue text. A page a body cites
can vanish from kb/ (wikitool search against the cited titles is the
second pass), and an old body can carry private infrastructure detail into
what is now a public tracker - both found in the same issue, both worth the
same look.
What no tool checks
wikitool does not know this tracker exists, and should not learn. It ships to
instances that have no issues at that URL, while this file and the workflow it
describes are pruned by dist export - a Gitea client inside the shipped tool
would be a dev-only dependency carried by every instance, to check a board none
of them have. The tracker is reachable only through the gitea-mcp server, in a
session, by an agent.
So there is no docs verify for the board. Nothing reports a closed issue whose
body still reads as open, a body that contradicts its own comments, or an issue
missing one of the four mandatory labels. Every one of those is caught by a
session following this file, or not at all - which is the argument for the
sequence in step 7 being explicit about the order (body first, then close),
rather than leaving it to be inferred from step 2.
Decision points
- Issue or changelog? An issue is work that is not done.
CHANGES.mdis what shipped. A finished change needs both: the entry, and the issue closed with the reasoning. - Issue or
kb/page? An issue is about this stack and is ephemeral - it closes, and it records a wish. Akb/page is verified knowledge that stays true. Never put wiki content findings in an issue, and never file a work item as a page. - Rewrite the body, or add a comment? Rewrite whenever a reader of the body alone would otherwise be misled - a changed decision, a dropped criterion, a new constraint. A comment carries the changelog line for that rewrite, and nothing else that a future session needs in order to act. Closing an issue is always a rewrite - see step 7.
- An old issue carries only
prio/andsize/? Complete it to all four when you touch it, rather than in a sweep. The board reaches the new scheme issue by issue, as each is picked up.